banner

Mina El Mochito, Honduras


Project developed through our Gramsa / Tetra Tech Alliance and later start with Gramsa / Land Group International. The activity was developed Monitoring Control Quality Assurance in the construction of the Dam and Tailings discharge line "La Soledad" in the Mochito mine, Honduras.
The project involves the construction of a reservoir with a capacity of 1 million m3 of tailings tails.
The construction of the dam involved the construction of a dam, pipeline installation for tailings discharge 7km and construction of a 1.3 km perimeter channel including rip rap construction, gabions and slope stability studies.